Oil Drilling Wells – Water Treatment Plant – Columbia

 

The facility has capacity of 4,000 m³ per hour (500,000 BWPD)

3 stages of filtration from 25micron through 7 and down to 1 micron followed by RO

600 PE & FRP lines

2,000 IOs

1,000 ton of steel

3,500 m³ of concrete

100 equipment units

Skip to content