Planning and execution of the installation of 2 steam lines, 3 condensate lines, 1 water line, and 1 air line.
Energy center, including the supply of electrical cabinets; a pipe rack approximately 300 meters long weighing 350 tons, including foundations; main steam piping (high and medium pressure); condensate piping connecting the new station to the existing energy center; and the connection of electricity supply from the Israel Electric Corporation (IEC) to the new power plant.