Commissioning, Validation and Training

Partial Handover, Regulatory Validation (CQV), and Staff Training for Safe, Continuous Commercial Operation

The final phase of commissioning an industrial or process plant is the moment when all systems, instrumentation, and infrastructure must operate in complete synchronization. Professional commissioning, regulatory validation, and structured site staff training are essential prerequisites for a smooth transition from engineering and construction to continuous commercial operation (Start-up).

Galil Group provides a comprehensive professional envelope for cold and hot commissioning, preparing rigorous validation protocols for regulated industries (such as pharma, biotech, and chemicals), and conducting customized hands-on training. Our experienced teams ensure the facility complies with all standards, reaches peak capacity in the shortest possible time, and prepares the client’s operational team to step into their roles with complete confidence.

Commissioning, Validation, and Training Services

  • Comprehensive Commissioning Plans (Cold & Hot Commissioning): Structuring and executing systematic commissioning processes – ranging from system, piping, and instrumentation testing without media (Cold Commissioning / Dry Run) to raw material introduction, full process startup, and reaching nominal operating parameters (Hot Commissioning / Wet Run).

  • Validation & Qualification Services (CQV) for Regulated Industries: Preparation, management, and execution of complex verification protocols according to strict international standards (GMP, FDA, EMA):

    • DQ (Design Qualification): Validating engineering design against client requirements and regulatory standards.

    • IQ (Installation Qualification): Verifying and documenting the correct on-site installation of equipment and infrastructure.

    • OQ (Operational Qualification): Operational validation and testing of all system operational scenarios.

    • PQ (Performance Qualification): Performance validation, process stability verification, and product quality compliance.

  • On-Site Staff Training and Instruction: Hands-on training programs tailored specifically for various organizational levels – field operators, process engineers, and maintenance and control personnel.

  • Standard Operating Procedures (SOPs): Authoring operating procedures, execution scripts, preventive maintenance protocols, and emergency response plans to ensure long-term operational continuity.

Relevant Projects

Quinteros, Chile

Project Type: EPC

Kochav HaYarden, Pumped Storage 344 MW

Project Type: EPC

OPC Hadera Power Plant

Project Type: DB

Advanced Technology Storage Facility – Gilboa

Project Type: DB

Natural Gas Plant Conversions

Project Type: DB

Independent Power Plant (IPP) – Ramat Gavriel

Project Type: DB

Skip to content