Collaboration with Know-How provider – ”GEA” Global (Turn Key for its scope) Off site services: Cooling water Chilled water R.O. water steam air Waste collection
6,000 Ton/year crops of Paprika Extracting paprika Oleoresin High quality paprika powder 15M$ Turn-key project in India
4 hectare greenhouse for growing tomatoes Utilizing Geo-Term Springs @ – 40 °C Ambient Temp 6 M$ Turn-Key project
350 M$ EPCM project, 40 months rolling schedule to deliver 12 dairy farms, 2400 milking cows each. 1M sqm of buildings. 25,000 Ton steel construction.
During the years Galil Group had many projects with Tower Semiconductors, here you can find details on three of them : Pilot tool install 8.5
New BU unit in Ramat Hovav site Galil scope : EPCM Project budget : 70M ₪ Some more numbers…. 46 P&IDs 110 Equipment units 800
Upgrade of the Phosphate & Potash conveying system in the port of Eilat Project target was to double the yield of the system and increase
Galil’s scope : Detailed design Project description : Formulations plant addition in Plant 43 360 lines 80 Civil & structural drawings ~7,000 engineering hours Complete
Galil’s scope : FEED 3D multi-discipline model design Permit submission Building area 14,145 sqm Concrete structure 8,000 m³ Steel structure 1,500 ton Building max. height
Galil Group – Head Office
Y.W. Galil Engineering Ltd.
P.O.B. 210, Ramat Ishay, Israel 3009500
E-mail: galileng@galileng.com
Phone: 972-4-9537201
Fax: 972-4-9837154
Galil Group – South Branch
O.N.Y. Galil Engineering Ltd.
Omer Industrial Park, Building No. 10
Omer, Israel, 8496901
Email: galileng@galileng.com
Tel: 073-2125300
Fax: 08-6280164
COPYRIGHT © 2011 GALIL. ALL RIGHTS RESERVED